The past week at the 1908 Shattuck construction site, has seen the shoring removed and the stripping of the PT Deck formwork. Once all of the shoring and formwork was removed, work began on framing the second floor, this will continue into this week. The next exciting event on site will be the installation of the third floor joists.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment