Today the 22 feet tall steel columns and steel beams were delivered to the 1908 Shattuck construction site. Work began early with all the members hoisted off the trucks by crane and set down on the PT Deck. Once the scaffolding was assembled, one by one the columns were carefully raised from the slab and secured onto the studs that protruded from the deck below. With all the columns and beams secured, the project now is starting to give a glimpse, as to how its size will alter the feel of the street.

Be sure to scroll down to the videos at the end!












   

   