The shoring for the PT Deck at the 1908 Shattuck construction site has now finished. All of the formwork from the pour last week is still standing. It will remain until the second floor slab's shoring comes down after the pouring of the PT deck in a months time. From the second floor just the Nelson studs can be seen standing proud of the PT deck.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment